PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

VAV Boxes 4.jpg Column Line E-1 4th Floor.jpg Erecting the stone panels at the West Elevation.jpg Installing duct work hangers at the 4th floor Facing West.jpg Installing storm piping at the 4th floor Facing North.jpg Judges mockup 1.jpg Judges mockup 2.jpg Laying out block at the 4th floor detention cells Facing West.jpg Lower roof metal framing Facing North-West.jpg
Previous pageNext page Installing storm piping at the 4th floor Facing North
Installing storm piping at the 4th floor Facing North